CA · Climate zone 2–6
Custom House Plans in California
Building in Los Angeles, San Diego, Sacramento or anywhere else in California? We draw your home from scratch around your inspiration, your lot and California's climate and code requirements. Customization is free and delivery starts at 24 hours.
Climate & energy
IECC climate zone 2–6. Insulation, window performance and HVAC sizing are drawn to match.
Foundations
Raised or pier foundations where flood zones apply; slab inland.
Permit-ready add-on
Engineer stamp for California: $1,500. Requirements vary by county, so check with your local building department.
Building requirements
Building a house in California: what the code requires
Statewide residential code
- Building code
- California Residential Code (Title 24, Part 2.5) applies statewide, with local amendments common in larger cities.
- Energy code
- California Energy Code (Title 24, Part 6) is one of the strictest in the US. New homes generally require solar PV, and all-electric readiness rules apply.
- Climate zone
- IECC climate zone 2–6. Insulation, windows and HVAC are sized to match.
- Typical frost depth
- 0–12 in (coast/valleys), 18–36 in (mountains). Footings must extend below the local frost line (confirm with your building department).
- Foundations
- Raised or pier foundations where flood zones apply; slab inland.
- Who can draw the plans
- Single-family homes can generally be designed by a non-licensed home designer. A licensed engineer's stamp is often required for structural items, engineered foundations or special hazard zones, or when the local building official asks for it.
- Engineer stamp
- If your jurisdiction requires sealed drawings, add our California Engineer Stamp / Permit-Ready package ($1,500).
California-specific rules & hazards
- CALGreen (Title 24, Part 11) green-building requirements apply to all new homes.
- Wildland-Urban Interface areas (Fire Hazard Severity Zones) require Chapter 7A ignition-resistant construction.
- Seismic design is required statewide, and plans often need engineered lateral (shear wall) calculations.
- Coastal Commission permits may apply within the coastal zone.
- Seismic bracing, shear walls and hold-downs
- Wildfire-resistant materials and defensible-space detailing
- Flood-zone elevation and coastal foundation requirements
Summary for planning only. Codes, editions and local amendments change, so always confirm current requirements with the building department that will issue your permit. Our designers check your jurisdiction before drawing.
City building requirements in California
Towns, villages & rural counties
Permit checklist for building in towns & counties across California
Requirements differ town by town. Use this checklist with your local building, zoning and health departments, and include what you learn in your design instructions. We'll draw to it.
- 01Find who issues permitsIncorporated towns and cities usually have a building department. In unincorporated areas it's the county building or planning office, or a state agency, or in some rural areas nobody. Call before you buy the lot.
- 02Zoning & setbacksCheck the zoning district for minimum lot size, front, side and rear setbacks, maximum height, lot coverage and whether barndominiums, ADUs or metal buildings are allowed.
- 03HOA & deed restrictionsSubdivisions often restrict minimum square footage, exterior materials, roof pitch, garage orientation and outbuildings. These can be stricter than the town code.
- 04Septic & well permitsWithout city sewer or water, you'll need a percolation (perc) test and a septic permit from the county health department, plus a well permit.
- 05Driveway & culvert permitConnecting to a public road usually needs a driveway or culvert permit from the town, county or state DOT.
- 06Floodplain development permitIf any part of the lot is in a FEMA flood zone, you'll need a floodplain permit and an elevation certificate, and the lowest floor must be at or above the Base Flood Elevation plus any local freeboard.
- 07Energy code complianceMost jurisdictions require an energy compliance report (REScheck or similar) showing insulation, windows and HVAC meet the adopted energy code.
- 08Engineering stampMany building officials require a licensed engineer's seal for foundations, beams, trusses, or high wind, snow or seismic zones. Add our Engineer Stamp option at checkout.
- 09Utility & fire accessRural lots may need a fire-apparatus access road, a water supply for firefighting, or wildfire (WUI) defensible-space and ignition-resistant materials.
- 10Inspections scheduleA typical sequence is footing, foundation, framing, rough MEP, insulation and final. A certificate of occupancy is issued after final inspection.
Popular house styles in California
Modern Plans in California
Clean lines, flat or shed roofs, floor-to-ceiling glass and indoor-outdoor living.
Mediterranean Plans in California
Stucco walls, clay tile roofs, arches and shaded courtyards.
Contemporary Plans in California
Bold massing, mixed cladding and bright, loft-like spaces.
Want something else? Browse all 12 home styles.
Delivery options for California clients
Standard
10 business days
Included
Priority
5 business days
+$299
Express
3 business days
+$499
Most popular
Rush
48 hours
+$799
Super Rush
24 hours
+$1,199
California house plan FAQ
Does California have a statewide residential building code?+
California Residential Code (Title 24, Part 2.5) applies statewide, with local amendments common in larger cities.
How deep do footings need to be in California?+
Typical frost depth in California is 0–12 in (coast/valleys), 18–36 in (mountains). Your local building department sets the exact minimum, and footings must go below it.
Do I need an engineer's stamp to build in California?+
Many California counties and cities require stamped structural drawings, especially for larger homes or homes in special hazard zones. Add our California Engineer Stamp / Permit-Ready package ($1,500) at checkout, and always confirm with your local building department.
What climate zone is California in?+
California falls in IECC climate zone 2–6. We size insulation, windows and wall assemblies to match, and we can include REScheck energy calculations.
What foundation is best for a house in California?+
Raised or pier foundations where flood zones apply; slab inland. We'll recommend the right option for your lot and soil, and you can change it at any time during revisions.
How fast can I get house plans for my California lot?+
Standard delivery is 10 business days. Rush (48 hours) and Super Rush (24 hours) are available, with free revisions for 30 days.
Let's design your California home
It takes about 10 minutes, and we save your answers as you go.