HousePlansUSA

AR · Climate zone 3–4

Custom House Plans in Arkansas

Building in Little Rock, Fayetteville, Fort Smith or anywhere else in Arkansas? We draw your home from scratch around your inspiration, your lot and Arkansas's climate and code requirements. Customization is free and delivery starts at 24 hours.

Climate & energy

IECC climate zone 3–4. Insulation, window performance and HVAC sizing are drawn to match.

Foundations

Crawlspace or basement, depending on soil and lot slope.

Permit-ready add-on

Engineer stamp for Arkansas: $750. Requirements vary by county, so check with your local building department.

Building requirements

Building a house in Arkansas: what the code requires

Statewide residential code

Building code
The Arkansas Fire Prevention Code includes a residential volume based on the IRC, adopted statewide; enforcement and inspections are local.
Energy code
Arkansas Energy Code for new residential construction, based on the IECC with amendments.
Climate zone
IECC climate zone 3–4. Insulation, windows and HVAC are sized to match.
Typical frost depth
12–18 in. Footings must extend below the local frost line (confirm with your building department).
Foundations
Crawlspace or basement, depending on soil and lot slope.
Who can draw the plans
Single-family homes can generally be designed by a non-licensed home designer. A licensed engineer's stamp is often required for structural items, engineered foundations or special hazard zones, or when the local building official asks for it.
Engineer stamp
If your jurisdiction requires sealed drawings, add our Arkansas Engineer Stamp / Permit-Ready package ($750).

Arkansas-specific rules & hazards

Summary for planning only. Codes, editions and local amendments change, so always confirm current requirements with the building department that will issue your permit. Our designers check your jurisdiction before drawing.

City building requirements in Arkansas

Towns, villages & rural counties

Permit checklist for building in towns & counties across Arkansas

Requirements differ town by town. Use this checklist with your local building, zoning and health departments, and include what you learn in your design instructions. We'll draw to it.

  1. 01Find who issues permitsIncorporated towns and cities usually have a building department. In unincorporated areas it's the county building or planning office, or a state agency, or in some rural areas nobody. Call before you buy the lot.
  2. 02Zoning & setbacksCheck the zoning district for minimum lot size, front, side and rear setbacks, maximum height, lot coverage and whether barndominiums, ADUs or metal buildings are allowed.
  3. 03HOA & deed restrictionsSubdivisions often restrict minimum square footage, exterior materials, roof pitch, garage orientation and outbuildings. These can be stricter than the town code.
  4. 04Septic & well permitsWithout city sewer or water, you'll need a percolation (perc) test and a septic permit from the county health department, plus a well permit.
  5. 05Driveway & culvert permitConnecting to a public road usually needs a driveway or culvert permit from the town, county or state DOT.
  6. 06Floodplain development permitIf any part of the lot is in a FEMA flood zone, you'll need a floodplain permit and an elevation certificate, and the lowest floor must be at or above the Base Flood Elevation plus any local freeboard.
  7. 07Energy code complianceMost jurisdictions require an energy compliance report (REScheck or similar) showing insulation, windows and HVAC meet the adopted energy code.
  8. 08Engineering stampMany building officials require a licensed engineer's seal for foundations, beams, trusses, or high wind, snow or seismic zones. Add our Engineer Stamp option at checkout.
  9. 09Utility & fire accessRural lots may need a fire-apparatus access road, a water supply for firefighting, or wildfire (WUI) defensible-space and ignition-resistant materials.
  10. 10Inspections scheduleA typical sequence is footing, foundation, framing, rough MEP, insulation and final. A certificate of occupancy is issued after final inspection.

Popular house styles in Arkansas

Want something else? Browse all 12 home styles.

Delivery options for Arkansas clients

Standard

10 business days

Included

Priority

5 business days

+$299

Express

3 business days

+$499

Most popular

Rush

48 hours

+$799

Super Rush

24 hours

+$1,199

Arkansas house plan FAQ

Does Arkansas have a statewide residential building code?+

The Arkansas Fire Prevention Code includes a residential volume based on the IRC, adopted statewide; enforcement and inspections are local.

How deep do footings need to be in Arkansas?+

Typical frost depth in Arkansas is 12–18 in. Your local building department sets the exact minimum, and footings must go below it.

Do I need an engineer's stamp to build in Arkansas?+

Many Arkansas counties and cities require stamped structural drawings, especially for larger homes or homes in special hazard zones. Add our Arkansas Engineer Stamp / Permit-Ready package ($750) at checkout, and always confirm with your local building department.

What climate zone is Arkansas in?+

Arkansas falls in IECC climate zone 3–4. We size insulation, windows and wall assemblies to match, and we can include REScheck energy calculations.

What foundation is best for a house in Arkansas?+

Crawlspace or basement, depending on soil and lot slope. We'll recommend the right option for your lot and soil, and you can change it at any time during revisions.

How fast can I get house plans for my Arkansas lot?+

Standard delivery is 10 business days. Rush (48 hours) and Super Rush (24 hours) are available, with free revisions for 30 days.

Let's design your Arkansas home

It takes about 10 minutes, and we save your answers as you go.